Mobile Nav

Toureen Retail
in
public sector

Royal Mail

Over an 18 month period we upgraded 151 bulk fuel tanks for the Royal Mail throughout mainland UK.

Clovemead fuel_systems_minor_works

Your team delivered high quality work on 151 sites across the UK in an extremely competent and professional manner.

Keith Murray
Baker Mallet
Project supervisors

Royal Mail – fuel tank installations

Over an 18 month period we carried out 151 fuel tank installations with accompanying drainage upgrades across the whole of the UK from the Scottish Isles to the South coast on behalf of Royal Mail. The old below ground tanks were cleaned out degassed and foam filled. The drainage work included the provision of class one oil water separators and complete fuel spill catchment systems.

 

Our work included:

  • New steel twin wall tanks to BS 799
  • Concrete
  • Hard foam
  • ACO drainage and sumps
  • Suction and return fuel lines
  • Class one oil water separators
  • Pumps and Gauging
  • Testing

Project details

Client
Royal Mail

Division
Fuel Systems & Minor Works

Sector
Public Sector